• English
Home ProductsIndustrial Treatment Equipment

Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition

Certification
China Shandong Better Environmental Protection Technology Co., Ltd certification
China Shandong Better Environmental Protection Technology Co., Ltd certification
I'm Online Chat Now

Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition

Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition

Large Image :  Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition

Product Details:
Place of Origin: Shandong, China
Brand Name: Better
Model Number: WFS
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: $3,999.00/sets 1-1 sets
Packaging Details: Container/seaworthy package
Supply Ability: 100 Set/Sets per Month

Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition

Description
Condition: New Applicable Industries: Building Material Shops, Manufacturing Plant, Machinery Repair Shops, Home Use, Retail, Construction Works , Energy & Mining
Showroom Location: Egypt, Canada, Turkey, United Kingdom, United States, Italy, France, Germany, Viet Nam, Philippines, Brazil, Peru, Saudi Arabia, Indonesia, Pakistan, India, Mexico, Russia, Spain, Thailand, Morocco, Kenya, Argentina, Chile, UAE, Colombia, Algeria, Sri Lank Type: Incinerator
Warranty: 1 Year Power: 7.5KW
Material: SS/CS, High Temperature Resistant Paint For Q235 Carbon Steel Production Capacity: 1000L/H
Machinery Test Report: Provided Video Outgoing-inspection: Provided
Marketing Type: New Product 2020 Warranty Of Core Components: 1 Year
Core Components: Engine Weight (KG): 3000 Kg
Color: Silver/ Blue Capacity: 10-500kgs/batch
Application: Solid Waste Quick Delivery: Within 5 Days After Receipt Of Payment
Port: Qingdao

Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 0
Product Description
Model
WFS-30
WFS-50
WFS-150
WFS-300
WFS-500
Burning Capacity
20-30kg/time (3-6 times/day)
30-50kg/time (3-6times/day)
100-150kg/time (3-6times/day)
200-300kg/time (3-6times/day)
300-400kg/time(3-6times/day)
Incinerator Size m (L*H*B)
1.45*0.9*1.75
1.8*1.15*3
2*1.4*3.5
2.2*1.4*3.8
3*2*4.8
Imputing Mouth Width (mm)
480*600
620*800
760*960
900*1100
1080*1280
Chimney External Diameter
(mm)
280
280
300
400
460
Draught Fan
0.37kw
0.37kw
0.5kw
1.1kw
1.1kw/0.55kw
Combustion Improver Device
0.11kw
Oil consumption: 4-6kg/h
0.11kw
Oil consumption: 4-10kg/h
0.11kw
Oil consumption: 4-10kg/h
0.22kw
Oil consumption: 7-14kg/h
0.22kw
Oil consumption: 7-14kg/h
Re-Burning Device
0.11 kw
Oil consumption 4-6 kg/h
0.11kw
Oil consumption: 4-10kg/h
0.22kw
Oil consumption: 7-14kg/h
0.37kw
Oil consumption: 10-20kg/h
0.37kw
Oil consumption: 15-26kg/h
Voltage
380v/220v
380v/220v
380v/220v
380v/220v
380v/220v
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 1
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 2
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 3
☞More Details>>> Click me! @ Email Us!☜
Application 1.Hospital waste 2. Waste incineration plants 3.Home waste 4.Infectious diseased animal body/fur/hair 5.Industrial waste,etc Advantages 1.Long lifetime 2.Simple operation 3.Avoid secondary pollution 4. Factory directly manufacture 5.Experienced engineers guidance and technical support 6.Sound after-sales service After Sales Service 1.Online support 2.Field installation 3.Commissioning and training 4.Field maintenance and repair service 5.Video technical support
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 4

Features:

1.Enclosed structure,smokeless,avoid secondary pollution,small occupied space.
2.Thickness of refractory material is much thicker than the same product of other company, the effect of preserving heat is better.
3.Energy saving,the working of combustion-supporting system is intermittent,so it won’t consume much fuel.
4.The machine is equipped with double chamber and double burner,under high temperature,the waste after treating can be fully decomposed,no black smoke.
5.Unique smoke purification room,its responsible for absorbing the acidic materials through calcium oxide.
6.Electric box with timer, temperature showing system and automatic ignition
7.Refractory material with Anti-rust paint,the service life is longer.
8.Inner air blower is individually controlled, protect from backfire and extend the life of burner.
9.Volume of second combustion chamber is bigger than others,so exhaust gas stays longer
10.3D installation video can be provided by us,save your cost for engineer.
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 5
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 6
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 7
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 8
Main Products
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 9
Project Case
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 10
Certifications
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 11
Company Profile
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 12
Exhibition & Team
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 13
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 14
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 15
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 16
Packing&Shipping
Plasma Gasification Waste Incinerator for Hospital and Animal Disposal Condition 17

Contact Details
Shandong Better Environmental Protection Technology Co., Ltd

Contact Person: Ms. Christine Zhu

Tel: +8613356363253

Send your inquiry directly to us (0 / 3000)

Other Products